期刊文献+

面向大规模定制的供应链计划模型研究 被引量:2

Study on the Model of Mass Customization Oriented Supply Chain Plan
下载PDF
导出
摘要 大规模定制(Mass Customization,MC)将定制生产和大规模生产这两种相互对立的生产方式有机地结合起来。大规模定制的实现要以供应链为基础,以计划系统为保证。阐述了面向大规模定制的供应链计划的研究意义和特点,在综合考虑供应链计划影响因素基础上,建立了面向大规模定制的供应链计划模型,并通过实例说明了模型的有效性和可行性。 Mass customization (MC) unites both relatively opposite production style,customized production and mass production,into one organically.The realization of MC must be based on supply chain and ensured hy production planning system.This paper expatiates the significance and characteristics for research of supply chain plan MC-oriented.Based on the comprehensive consideration for affected factors for supply chain plan,establishes the mathematical model of supply chain plan MC-oriented and explains the validity and feasibility of the model by illustrations.
出处 《机械管理开发》 2006年第6期17-21,共5页 Mechanical Management and Development
关键词 大规模定制 生产计划 供应链计划 Mass customization(MC) Production plan Supply chain plan
  • 相关文献

参考文献5

二级参考文献21

  • 1陈志祥,马士华,陈荣秋.供应链环境下企业合作对策与委托-代理机制初探[J].管理工程学报,2001,15(1):75-76. 被引量:22
  • 2韩永生.21世纪的中国成组技术——发展成组技术.迎接知识经济的到来[A]..中国机械工程学会成组技术分会第七届年会论文集[C].,1999..
  • 3蒋平.面向大规模定制生产的产品设计[A]..中国机械工程学会成组技术分会第七届年会论文集[C].,1999..
  • 4Bose S, Pekny J F. A model predictive framework for planning and scheduling problems: a case study of consumer goods supply chain[J]. Computers and Chemical Engineering,2000,24:329~335.
  • 5Gerard P C, Paul H Z. Competitive and cooperative inventory policies in a two-stage supply chain[J]. Management Science,1999,45(7):936~953.
  • 6Gerard P C. Managing supply chain demand variability with scheduling ordering policies[J]. Management Science,1999,45(6):843~856.
  • 7Charles J C. Stochastic inventory system in a supply chain with asymmetric information:cycle stocks,safety stocks,and consignment stock[J]. Operations Research,2001, 49(4): 487~500.
  • 8Edgar Perea-Lopez,B Erik Ydstie,Ignacio E,Grossmann. A model predictive control strategy for supply chain opti-mization[J]. Computers and Chemical Engineering, 2003, 27: 1201~1218.
  • 9Moon C, Kim J, Hur S. Integrated process planning and scheduling with minimizing total tardiness in multi-plants supply chain[J]. Computers and Industrial Engineering, 2002, 43(1): 331~349.
  • 10Tormos P,Lova A.Tools for resource-constrained project scheduling and control:forward and backward slack analysis[J]. Journal of Operations Research Society,2001, 52: 779~788.

共引文献34

同被引文献10

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部