摘要
依据国家有关标准和电力行业标准及规范,对华南某燃煤发电厂采用石灰石-石膏湿法脱硫设施的建设,从设计、烟道防腐及安装工艺、进口设备、箱罐结构等方面的质量进行了跟踪监督,对存在典型具有普遍性的质量缺陷进行了理论分析,提出了消除质量缺陷的整改方案。
In accordance with the relevant national standards and electri power industry's standards and specifications, the constractions of limestone - gypsum wet method flue gas desulfurization (FGD) facilities in one coal - fred power plant in south China, from the quality of design,anticorrosion of flue gas duct,erection technology to the import equipment,packing box and tank structures ete.aspects,were tracked and supervised, the existing typical and general quality defects were theoretically analyzed and the scheme of eliminating the quality defects was propose.
出处
《电力设备》
2007年第1期61-64,共4页
Electrical Equipment
关键词
脱硫
工艺
设计
结构
燃煤发电
质量监督
desulfurization
technobgy
design
structure
coal- fred power plant
quality supervision