5Ahmed B. Senouci. Resource Scheduling using neural dynamics Model of ADELI and Park[J].Journal of Construction Engineering and Management, ASCE,2001,127(1):28-34.
9[美]Zbigniew Michalewicz,Fogel David B,曹庆红,李艳,等译.如何求解问题-现代启发式方法[M].北京:中国水利水电出版社,2003.
10Baragilia R, Hidalgo Ji, Perego R. A hybrid heuristic for the traveling salesman problem [ J ]. IEEE Transactions on Evolutionary Computation,2001,5 (6) :613-622.