期刊文献+

基于模糊综合评判工程建设项目合同模式分析

Analysis on the Fuzzy and Synthetic Appraisal Contract Modes of Construction Projects
下载PDF
导出
摘要 通过对建设项目合同的三种模式:固定价格合同、单价合同和成本加价合同的分析,建立了评价该模式指标体系,提出了模糊综合评判模型,为选择合适的建设项目合同模式提供一种可靠的分析方法。 After analyzing the three moles of construction project contract, the regular price contract, unit price contract and cost - plus pricing contract, this article has built an index system of the above modes and proposed a fuzzy and synthetic appraisal mode, which can help choosing a suitable mode.
作者 柳立生
出处 《山西科技》 2007年第1期38-39,共2页 Shanxi Science and Technology
关键词 模糊综合评判 工程建设项目 合同模式 系统分析 fuzzy synthetic appraisal eonstruction project contract mode systematic analysis
  • 相关文献

参考文献2

二级参考文献7

  • 1Broome Jon, Perry John. How practitioners set share fraction in target cost contracts [J]. International Journal of Project Management,2002, (20): 59-66.
  • 2Turner J Rodney, Simister Stephen J. Project contract management and a theory of organization [J]. International Journal of Project Management, 2001, (19): 457-464.
  • 3Al-Subhi Al-Harbi Kamal M. Sharing fractions in cost-plus-incentive-fee contracts [J]. International Journal of Project Management,1998,16(2): 73-80.
  • 4Berends T C. Cost plus incentive fee contracting - experiences and structuring[J]. International Journal of Project Management, 2000,(18): 165-171.
  • 5诸克军,张新兰,肖荔瑾.Fuzzy AHP方法及应用[J].系统工程理论与实践,1997,17(12):64-69. 被引量:107
  • 6张绍文,李祥仪,李仲学.矿井开采条件的模糊综合评价研究[J].系统工程理论与实践,1998,18(9):65-71. 被引量:10
  • 7阮连法,熊鹰,陶琦.模糊方法在设计方案比选中的应用[J].建筑经济,1999(9):19-22. 被引量:8

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部