摘要
将网络计划中的有限资源的合理分配问题与资源均衡问题统一起来,建立多资源分配的非线性整数规划模型,结合蒙特卡罗方法给出了算法,并与整数规划方法的运行结果进行比较.
This paper unifies the problem of resource balance and the problem of limited resource allocation in PERT/CPM network and establishes a model of non-linear integral programming for multi-resource allocation. It also gives a algorithm by the use of Monte-Carlo method and compares calculating results with operational results of linear integral programming.
出处
《沈阳建筑工程学院学报》
1996年第3期297-300,共4页
Journal of Shenyang Archit Civil Eng Univ: Nat Sci
关键词
非线性规划
网络计划
资源
分配
建筑施工计划
non-linear programming
Monte-Carlo method
algorithms
PERT/CPM network