摘要
介绍了工程建设中限额设计的意义及提倡限额设计的必要性,从设计人员的经济核算、初步设计、优化设计、设计变更四个设计环节论述了限额设计在控制造价工程中的应用,以有效控制工程造价,推广应用限额设计。
The meanings of cost limited design as well as necessity to carry out cost limited design is introduced. From four aspects: economic accounting, primary design, optimum design, design alteration the application of cost limited design in cost control is discussed in order to realize effectively control of engineering cost and promote cost limited design.
出处
《山西建筑》
2007年第2期268-269,共2页
Shanxi Architecture
关键词
工程造价
限额设计
设计变更
优化设计
engineering cost, cost limited design, design alteration, optimum design