摘要
我国自行研发的可升降液压爬升模板施工技术,采取爬升1层墙柱,浇筑1层楼板的施工工艺,已成功地在欧洲最高建筑、世界最高全现浇钢筋混凝土结构工程中应用。该文介绍了该项技术的特点和具体做法。
The construction technology of hydraulic up-climbing shuttering is developed by our country, and the construction technique of it is after up-climbing one floor walls and columns, pouring one floor slab. The technology is used successfully in the construction of the building, which is the tallest building in Europe, the tallest complete cast-in-place reinforced concrete structure in the world. The article introduces the characteristics and construction methods of that technology.
出处
《施工技术》
CAS
北大核心
2007年第2期26-29,共4页
Construction Technology
关键词
液压爬升模板
爬模装置
升降千斤顶
支承杆
脱模
hydraulic up-climbing shuttering
creeping formwork device
lifting jack
support pole