在陈四楼煤矿煤层倾角达38°的2207工作面的综采设备安装过程中,成功地解决了顺槽向工作面转弯、开切眼内轨道下滑、运送液压支架车辆失稳等一系列技术难题,仅用16天即完成安装任务,未发生一起人身及设备事故。
During the installation processing of the fully mechanized longwall mining equipment for No. 2207 mining face in 38° inclined seam of Chensilou Mine, a series of technical problems, such as mining gateway turning, rail line down sliding in open off cut and stability lost of the hydraulic support transportation vehicle have been successfully solved. Within 16 days, the equipment installation has been completed without any accident of person or equipment.
出处
《煤炭工程》
北大核心
2007年第3期51-53,共3页
Coal Engineering
关键词
大倾角
综采工作面
设备安装
开切眼
tilt angle
fully - mechanized mining face
installation method
open - off cu