摘要 由于对安全性、稳定性的要求极高,核电行业的风险管理一直是一个热门的话题,其中供应风险管理是核安全管理最为重要的问题之一,对核电站安全、稳定运行具有重要影响。研究了基于群决策的核电站供应风险测度方法,运用层次分析法比较风险要素权重;根据专家判断矩阵之间的相似性赋予各专家权重;结合风险要素打分和专家权重得到各风险要素的综合风险当量,使得结果更加科学。 Risk management in the nuclear industry has been a hot and stability. Supplying risk management is of significance for the topic due to the demand of strict security nuclear safety. A risk measure method is presented under the group decision making environment. By using Analytical Hierarchy Process method the weights of risk factors are determined, and the weight of each expert is formulated according to the similarity of judgment matrix. And then, the comprehensive risk exposure can be achieved by integrating the risk assessment and the expert weight. The proposed method could be helpful for managers to develop a well - structured risk management decision.
出处 《武汉理工大学学报(信息与管理工程版)》 CAS 2007年第3期72-75,共4页 Journal of Wuhan University of Technology:Information & Management Engineering
基金 国家自然科学基金资助项目(70571025)
关键词 核电站 备件供应 风险测度 nuclear power station spare parts supplying risk measurement
  • 相关文献

参考文献11

二级参考文献47

  • 1张金隆,谢刚,卢新元.一种基于VPRS的IT项目投标风险要素评价方法[J].管理学报,2004,1(2):192-194. 被引量:9
  • 2陈清泰.中国的能源战略和政策[J].天然气技术与经济,2003,0(6):4-7. 被引量:2
  • 3USNRC.Maintenance Rule[R].10 CFR 50.65,1999.
  • 4Chapman J R,Dimitrijevic V B.Challenges in using a probabilistic safety assessment in a risk informed process[J].Reliability Engineering and System Safety,1999,63:251-255.
  • 5Wall I B,Haugh J J,Woiuege D H.Recent application of PSA for managing nuclear power plant safety[J].Progress in Nuclear Energy,2001,39(3-4):367-425.
  • 6Chien S H,Hook T G,Lee R J.Use of the safety monitor in operational decision making at a nuclear generating facility[J].Reliability Engineering and System Safety,1998,62:11-16.
  • 7USNRC.An Approach for Plant-Specific,Risk-Informed Decision making:Technical Specifications[R].Regulatory Guide 1.177,1998.
  • 8USNEI.Nuclear Energy Institute Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plants[R].NUMARC 93-01,Rev 3,2000.
  • 9Friedman L.A competitive bidding strategy[J].Operations Research,1956,4 (1):104-112.
  • 10Rothkopf MH.A model of rational competitive bidding[J].Managment Science,1969,15:362-373.

共引文献243

同被引文献41

  • 1夏喆,邓明然,黄洁莉.企业风险传导进程中的耦合性态分析[J].上海管理科学,2007,29(1):4-6. 被引量:7
  • 2Lindroth.Supply chain risk and risk sharing instruments-an illustration from the telecommunication industry[C]// Proc.of the Logistics Research Network 6th Annual Conference,2010:20-21.
  • 3Yang B,Burnsb N.The implications of postponement for the supply chain[J].International Journal of Production Research,2003,41(9):2075-2090.
  • 4Cranfield,Preckel.Estimating consumer demands across the development spectrum:maximum likelihood estimates of an implicit direct additivity model[J].Journal of Development Economics,2002,68(2):289-307.
  • 5Tobias.Assessing supply chain risks with the analytic hierarchy process:providing decision support for the offshoring decision by a US manufacturing company[J].Purchasing and Supply Management,2008,14(4):100-111.
  • 6Yosef,Sheffi.A comparison of stochastic and deterministic traffic assignment over congested networks[J].Trans.Portation Research Part B:Methodological,1981,41(5):53-64.
  • 7George S,Phillip E.Competing on capabilities,the new rule of corporate strategy[J].Harvard Business Review,1992,21(3):12-15.
  • 8Rochford.New product development process:Stages and successes in the medical products industry[J].Marketing Management,1997,26(1):67-84.
  • 9Timothy,Margulies.Risk optimization:siting of nuclear power electricity generating units[J].Reliability Engineering & System Safety,2004,86(3) 323-325.
  • 10Patton,Dennis.Counselor recognition of transference reactions:reply to mallinckrodt (1996) and Carter (1996)[J].Counseling Psychology,2006,43(3):259-260.

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部