摘要
以国华台电1号、2号机组的快速减负荷(RUNBACK)试验为例,叙述了机组RUNBACK试验成功的一些启示,并对新机组进入168h考核试验前进行机组RUNBACK试验的有利因素和有利结果进行了分析。
Taking the RUNBACK test of Units 1 and 2 in Guangdong Guohua Yudean Taishan Power Generation Co., Ltd. as an example, this paper describes the enlightenment gained from the success of the test. The advantages and the favorable results of making RUNBACK test before 168 h check test on new units are analyzed as well.
出处
《广东电力》
2007年第3期38-40,共3页
Guangdong Electric Power