广西下桥碾压混凝土拱坝施工仿真分析

Simulation analysis of roller compacted concrete arch dam construction in Xiaqiao of Guangxi autonomous region
下载PDF
导出
摘要 本文根据实际施工进度及实际测得的相关热力学参数,对碾压混凝土拱坝进行三维有限元仿真分析,综合考虑了气温、水温、自重、水压、水化热、徐变等的共同作用,计算得到了坝体从施工到运行共650d的温度场及应力场分布情况,表明在坝体施工阶段32m坝高附近会产生较大的拉应力,导致坝体出现裂缝,计算结果和实际情况比较吻合。 The three-dimensional finite element simulation analysis of roller compacted concrete arch dam is conducted according to construction schedule and actual measurement thermodynamic parameters.The temperature field of dam in 650 days from the construction to the obtained and the distribution of stress field are obtained under the comprehensive action of air temperature,water temperature,dead weight,water pressure,hydration heat and creep.The result indicates that considerable tensile stress is produced close to 32 m of dam height in the construction of dam,it leads to the fissure of dam.The calculation result accords with the actual situation.
出处 《东北水利水电》 2007年第4期1-3,共3页 Water Resources & Hydropower of Northeast China
关键词 下桥碾压混凝土拱坝 仿真分析 三维有限元 roller compacted concrete dam of Xiaqiao simulation analysis three-dimensional finite element
  • 相关文献

参考文献1

  • 1SL314-2004,碾压混凝土坝设计规范[S].

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部