摘要
根据多家大型医院的筹建或参与设计实践,从建筑布局、强电系统、弱电系统和PACS系统、接地系统、空调系统和消防系统、防护系统、悬挂系统、设备安装系统等方面,探讨其建筑布局,总结经验和体会。
Learned from several tertiary hospital radioactive equipment room construction design, the hospital radioactive equipment room building arrangement, strong electric system, weak electric system, PACS system, electrical grounding system, air condition system, fire fighting system, preventive system, hanging system and equipment installation system were mentioned.
出处
《中国医院》
2007年第4期78-80,共3页
Chinese Hospitals
关键词
放射机房
基建工程
radioactive equipment room, basic construction