期刊文献+

雪山工程—水力发电与跨流域调水综合工程 被引量:3

The Snowy Mountain Scheme-A Combined Hydro-electric Generation and Inter-Basin Transfer Scheme
下载PDF
导出
摘要 雪山工程位于澳大利亚东南部的墨累达令流域,是一项在墨累河和马兰比吉河上进行水力发电、农业灌溉调水和河道管理的综合工程。从工程管理、规划、主要设施建设、调水量、水权、用水分配原则以及一些环境问题的角度介绍雪山工程的情况。 The Snowy Mountain Scheme, located in southeast Australia, is a project which integrates hydro? electricity generation and the transfer of water for irrigation and river management in the Murray and Murrumbidgee river systems, which are both located in the Murray-Darling Basin. The purpose of this paper is to provide information about the Scheme, including its governance, the layout, engineering features, water releases, rights to water and water release rules and some of the environmental issues.
出处 《南水北调与水利科技》 CAS CSCD 2007年第2期97-100,共4页 South-to-North Water Transfers and Water Science & Technology
基金 澳大利亚青年发展大使项目(AYADINTAKE15) 中国科学院知识创新方向性项目(KZCX3-SW-446)
关键词 跨流域调水 澳大利亚 雪山工程 墨累达令流域 inter-basin transfer schemes Australia Snowy Mountain Scheme Murray-Darling Basin
  • 相关文献

参考文献10

  • 1[1]Australian Bureau of Meteorology,2006.Learn about Meteorology:Climate Education.Available at:http://www.bom.gov.au/lam/climate/.
  • 2[2]Commonwealth of Australia,2001.Australian Water Resources Assessment 2000.Surface water and groundwater-availability and quality.Prepared by:National Land and Water Resources Audit c/o Land and Water Resources Audit on behalf of the Commonwealth of Australia,Australian Capital Territory,February 2001.Available at:http://audit.ea.gov.au/ANRA/water/docs/national/water_contents.html.
  • 3[3]Commonwealth of Australia,2000a.Corporatisation of the Snowy Mountains Hydro-electric Authority.Draft Environmental Impact Statement.Prepared by the Department of Industry,Science and Resources,Canberra,Australian Capital Territory,June 2000.Available at:http://www.industry.gov.au/assets/documents/itrinternet/smhea-eis.pdf.
  • 4[4]Murray-Darling Basin Commission (MDBC),2006a.Murray-Darling Basin Initiative Website.Available at:http://www.mdbc.gov.au/.
  • 5[5]Murray-Darling Basin Commission (MDBC),2006b.Murray-Darling Basin Water resources Fact Sheet-July 2006.Murray-Darling Basin Commission,Canberra.
  • 6[6]Snowy Hydro Limited (SHL),2003.Snowy Hydro Limited Website.Available at:http://www.snowyhydro.com.au/.
  • 7[7]Department of Industry,Tourism and Resources (DITR),2006a.Snowy Reform.Available at:http://www.industry.gov.au/content/itrinternet/cmscontent.cfm?objectid=63B0AB76-B1EC-4748-8F4CD16FF00D23C7&searchID=250517.Last updated:20 September 2006.
  • 8[8]Fullerton,T.,2001.Watershed:Water Use in Australia:Juggling the Needs of Ordinary People-and Nature.Australian Broadcasting Cooperation Books,Sydney NSW 2001.
  • 9[9]Price,D.G.,1999.The Snowy Mountain Scheme-The History and the Snowy Today.Australian Academy of Technology and Sciences and Engineering Symposium,November 1999.Available at:http://www.atse.org.au/index.php? sectionid=294.
  • 10[10]Commonwealth of Australia,2007.A National Plan for Water Security.Prepared on January 1,Available at http://www.pm.gov.au/docs/national_plan_water_security.pdf.

同被引文献49

引证文献3

二级引证文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部