公路隧道前置式洞口工法的三维数值分析 被引量:24

3D simulation and analysis of highway tunnels by use of advanced entrance construction method
下载PDF
导出
摘要 以宁(南京)淮(安)高速公路老山公路隧道为依托,对洞口前置式洞口施工过程的力学行为进行了三维数值模拟,分析了洞口段围岩和前置式支护结构体的位移场、应力。计算结果表明:前置支护结构及两洞间土体对洞口山体的支撑作用明显,既可大大减少洞口的边、仰坡开挖量保护洞口环境,又能有利于洞口段稳定和洞口施工安全。 The construction process of advanced entrance of highway tunnel was simulated, and the stress and displacement in surrounding rock and advanced support structure were analyzed based on the actual conditions of Laoshan highway tunnel located on Nanjing-Huaian Highway. It was shown that the advanced support structure and soil body between the two tunnels had good effect on the slope stability of mountain. The construction of advanced entrance of highway tunnel was beneficial not only to the reduction of the amount of slope excavation but also to the stability and safety of the tunnel entrance.
出处 《岩土工程学报》 EI CAS CSCD 北大核心 2007年第4期484-489,共6页 Chinese Journal of Geotechnical Engineering
关键词 公路隧道 前置式洞口工法 施工过程 数值分析 highway tunnel advanced entrance construction method construction process numerical simulation
  • 相关文献

参考文献9

二级参考文献26

  • 1祝况,伍昌.英吉利海峡海底隧道的工程技术和环境保护[J].全球科技经济瞭望,1995,10(12):27-29. 被引量:5
  • 2刘洪洲.三车道隧道的设计工法探讨[A].中国公路隧道学会编.1999年全国公路隧道学术交流会议论文集[C].昆明:[s.n.],1999.43-46.
  • 3ADAC. Europe: Safety in Road Tunnels[J]. Tunnel. 1999.5.
  • 4王孝国.川九公路建设的生态理念与环保措施[A]..中国公路学会2003年学术年会论文集[C].,.326-328.
  • 5蒋树屏.我国公路隧道工程技术的现状及展望[A]..中国公路学会2001学术交流论文集[C].北京:中国公路杂志社,2001-09..
  • 6.JTG D70-2004 公路隧道设计规范[S].北京:人民交通出版社,2004..
  • 7.JTJ042-94 公路隧道施工技术规范[S].北京:人民交通出版社,1995..
  • 8南京市老山林场志编委会.南京市老山林场志[R].,2001-12..
  • 9JTJ 042-1994.公路隧道施工技术规范(附条文说明)[S],1994.
  • 10JTG D70-2004.公路隧道设计规范[S],2004.

共引文献113

同被引文献190

引证文献24

二级引证文献163

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部