期刊文献+

新疆泵站工程机电设计浅析

Analysis of the Electromechanical Design of Pumping Project in Xinjiang
下载PDF
导出
摘要 针对近年来新疆大中型泵站规划设计中遇到的典型问题,通过工程技术经济反复比较论证的方法,对干旱、沙漠、高寒、高海拔地区建设泵站工程机电专业设计方面的若干特点进行了探讨。干旱区域引调水泵站工程的建设,解决了部分绿洲经济系统与荒漠生态系统水资源供需矛盾,加速了新疆社会经济快速发展。 According to the problems we encountered in recent years in the planning and design of large- and medium-sized pumping stations, this paper deeply discusses several characteristics of electromechanical design of pumping stations constructed on the droughts, deserts, the high altitude and elevation areas by using the comparisons and demonstrations of engineering technology. The construction of pumping projects in arid areas has solved the partly eonfliction of water supply and demand between oasis economic system and desert ecosystem and has speeded up the social and economic development in Xinjiang.
作者 钟丽新
出处 《水力发电》 北大核心 2007年第3期63-65,79,共4页 Water Power
关键词 泵站 供电方案 机电设备 全微机监控保护 pumping station power-supply plan electromechanical equipment microcomputer monitoring protection
  • 相关文献

参考文献4

二级参考文献5

  • 1Peponis G J, Papadopoulos M P, Hatziargyriou N D. Distribution network reconfigutation to minimize resistive line losses[J]. IEEE Trans. On Power Delivery, 1995, 10(3): 1338-1342.
  • 2Dorigo M,Maniezzo V,Colorni A.Ant system:Optimization by a colony of cooperating agents[J]. IEEE Trans. On System,man,and Cyberneticspart B:Cybernetics, 1996,26(1):29-41.
  • 3Dorigo M,Car G D.Ant colony optimization:a new metaheuristic[C]. Proceeding of the 1999 congress on Evolutionary Computation,Washington ,D C,USA,1999:1470-1477.
  • 4Dorigo M,Dicaro G,Gambardella L M. Ant Algorithm for Discrete Optimization[J]. Artificial Life, 1999,5(2):137-172.
  • 5陈振生.智能化高压电器(上)[J].电气开关,1998(5):1-7. 被引量:7

共引文献71

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部