期刊文献+

基本作战单元预防性维修保障过程建模仿真 被引量:10

Modeling and Simulation of Base Operational Unit Preventive Maintenance Support Process
下载PDF
导出
摘要 为分析评价基本作战单元预防性维修保障方案,计算分析预防性维修时间,根据系统工程建模思想描述了基本作战单元的预防性维修过程,提出了故障发生比、更换比和报废比参数,建立了仿真模型,并根据MonteCarlo仿真原理给出仿真算法,为型号工作人员和装备使用人员进行保障性分析提供了理论方法和技术手段,最后以某型飞机组成的基本作战单元为例,对其预防性维修保障方案进行仿真试验验证,分析了预防性维修过程的改进对保障资源和维修时间的影响。 To analyze Base Operational Unit (BOU) preventive maintenance (PM) stratagem and accurately calculate PM time, this paper describes BOU PM process according to system engineering modeling ideology. Failure Denoted Rate(FDR), Replace Rate(RR) and Dispose Rate(DR) parameters are presented and simulation algorithm is made out according to Monte Carlo simulation method. Theory and technology are offered to equipment designers and equipment pilots in the supportability analysis. The PM Concept(PMC) is validated in an airplane unit via simulation tests. The influence of the improved PM process on support resource and maintenance time is analyzed.
作者 郭霖瀚 康锐
出处 《计算机仿真》 CSCD 2007年第4期36-39,86,共5页 Computer Simulation
关键词 装备保障 预防性维修 建模 维修工作类型 离散事件仿真 Equipment support Preventive maintenance Modeling Maintenance task type Discrete events simulation
  • 相关文献

参考文献9

  • 1马绍民.综合保障工程[M].北京:国防工业出版社,1995..
  • 2王亚彬,贾希胜,康建设.仿真技术在维修资源预测中的应用研究[J].计算机仿真,2005,22(7):249-251. 被引量:10
  • 3章文晋,康锐,郭霖翰,李瑞莹.Study on Military Equipment Support Modeling and Simulation[J].Chinese Journal of Aeronautics,2005,18(2):142-146. 被引量:15
  • 4杨为民,屠庆慈,盛一兴,祝渊.民用飞机蒙特卡罗可靠性仿真[J].北京航空航天大学学报,1992,18(1):16-23. 被引量:4
  • 5Warrington Les,A Jones Jeffery,Davis Neil.Modelling of maintenance,within discrete event simulation[C].In:Proceedings of the Annual Reliability and Maintainability Symposium,Seattle.WA:IEEE,2002.
  • 6John Moubray,Reliability-Centered Maintenance[M].Second Edition.New York:Industrial Press Inc,1997.
  • 7Benjamin S Blanchard,Wolter J.Fabrycky.Systems Engineering And Analysis[M].Third Edition.New Gersey:Prentice-Hall,2002.
  • 8Averill M Law,W David Kelton.Simulation Modeling and Analysis[M].Third Edition.New York:McGraw-Hill,2000.
  • 9P Gupta,M Bazargan,R N McGrath.Simulation model for aircraft line maintenance planning[C].In:Proceedings of the Annual Reliability and Maintainability Symposium,Tampa.FL:IEEE,2003.

二级参考文献9

  • 1周青龙.可靠性工程[R].石家庄: 军械工程学院,1993-3..
  • 2Visker E R. Improving the DoD Supply Chain ′Can Commercial Supply Chain Management Software Do the Job′[R]. ADA378230,Carlisle Barracks, PA:Army War Coll, 2000.
  • 3张柳.[D].石家庄:军械工程学院,2003.
  • 4Novak L A, Drazek G. P, Stimatze G L. Logistics technology 2010[R]. ADA386571, McLean, VA:Logistics Management Inst, 2000.
  • 5Ruck J L. Object-oriented discrete-event simulation of logistics (modeling focused logistics) [R]. ADA356030,Monterey, CA:Naval Postgraduate School, 1998.
  • 6甘茂治 康建设 等.军事装备维修工程学[M].北京:国防工业出版社,1999..
  • 7杜志刚,盛一兴.民机营运维修保障系统仿真[J].北京航空航天大学学报,1997,23(4):420-424. 被引量:5
  • 8杨宇航,冯允成,庾红,李会杰.基于仿真的复杂武器系统任务可靠性计算方法研究[J].系统仿真学报,2002,14(2):169-172. 被引量:10
  • 9杨宇航,冯允成.复杂可修系统可靠性维修性综合仿真研究[J].系统仿真学报,2002,14(8):978-982. 被引量:28

共引文献84

同被引文献82

引证文献10

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部