小木岭二级站顶盖压力过高的成因分析及技改措施

Analysis and Technical Transformation of Over-pressure in the Turbine Top Cover in Xiaomuling Secondary Hydro Power Station
下载PDF
导出
摘要 针对小木岭二级水电站高水头混流式机组顶盖水压过高的问题,通过对机组实际运行数据和转轮结构的分析并结合理论分析,提出了改变转轮上冠止漏环型式并适当减小止漏环间隙以增强止水效果的技术改造方案,结果表明技改方案是成功的。 Considering the problem of over-pressure in the high head Francis turbine top cover in Xiaomuling hydro power station No. 2,a technical transformation scheme was carried out through analyses of a series of operating data of the turbine and structure of the runner, combined with theoretical analysis. In order to enhance the effect of sealing, changing the form of runner crown seal ring and decreasing the seal clearance appropriately are suggested. After accomplishing the scheme, it is shown that the technical innovation is successful by operating data of the turbine.
作者 李庆彬 余波
出处 《水电能源科学》 2007年第2期113-115,共3页 Water Resources and Power
关键词 水电站 水轮机 顶盖压力 止漏环 止漏环间隙 hydropower station hydraulic turbine water pressure of the top cover seal ring gap of seal ring
  • 相关文献

参考文献4

  • 1哈尔滨大电机研究所.水轮机设计手册[M].北京:机械工业出版社,1976..
  • 2李序量,程学文.水力学[M].北京:水利电力出版社,1978.
  • 3韩玉泉.水轮机过流部件修复[J].四川水力发电,2001,20(2):65-67. 被引量:2
  • 4中国电力企业联合会标准化中心.水轮发电机组安装技术规范(GB/T8564-2003)[S].北京:中国标准出版社,2004.

共引文献67

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部