摘要
地铁盾构隧道在通过不良地质条件地段施工过程中会对地层产生扰动,可能引起地表及周边建筑物变形或沉降,尤其是隧道穿过正在施工的基坑止水幕墙时,可能会拉裂幕墙危及基坑及附近建筑物安全,因此必须进行监测。文章介绍了广州地铁盾构隧道施工过程中的第三方监测的经验和体会,可供同类工程施工中借鉴。
Shield boring of a metro tunnel through adverse geological section will cause disturbance to the ground, resulting in the deformation and settlements of the buildings in the vicinity, in particular, when shield driving traverses the water - stopping curtain walls of a pit under construction it may split the walls, endangering the safety of the pit and surrounding buildings. Consequently, monitoring should be exercised. The paper introduces the experience and understandings of the third party monitoring obtained in the practice of Guangzhou metro shield tunneling, which can be taken for reference by similar projects.
出处
《现代隧道技术》
EI
北大核心
2007年第2期48-51,共4页
Modern Tunnelling Technology
关键词
广州地铁
盾构隧道
环境影响
监测
Guangzhou metro
Shield tunneling
Impact on environment
Monitoring