摘要
结合某500kV送电工程黄河下游大跨越群桩基础冲刷问题的实践,分析了黄河下游滩地群桩基础冲刷深度的计算方法,可供类似工程参考。
This text combines the fulfillment that the some 500 kVs Large crossing overhead transmission line Cluster stake foundation washof the yellow river downstream, analyzing the calculation method of the yellow river downstream bottoml Cluster stake foundation washdepth, can be provided as similar engineering reference.
出处
《电力勘测设计》
2007年第2期34-36,共3页
Electric Power Survey & Design
关键词
线路
大跨越
群桩基础
冲刷深度
计算
transmission line
large crossover
pile group foundation
wash depth
calculation.