期刊文献+

模拟沸石垂直潜流人工湿地除磷性能试验 被引量:2

Phosphorus removal performance of vertical subsurface flow constructed wetland with zeolite as substrate material
下载PDF
导出
摘要 为确定沸石作为人工湿地基质的可行性,就沸石静态吸附和模拟沸石人工湿地去除生活污水中的总磷进行了试验。结果表明,温度降低时TP最大理论吸附量上升11.63%;最大TP解析量占最大吸附量的2.31%;本试验条件下,模拟沸石人工湿地对生活污水中TP的平均去除率为34.12%。就TP的去除而言,沸石不适合单独作为人工湿地基质,若采用应注意因TP解析而形成的二次污染。 In order to confirm the feasibility of using zeolite as substrate material of constructed wetland, a test that removing total phosphorus from domestic wastewater by zeolite static adsorption and constructed wetland with zeolite as substrate material was carried out. The results showed that, with temperature decreasing, the maximal theoretical TP adsorption capacity increased 11.63%, the maximal TP desorption capacity accounted for 2.31% of the maximal adsorption capacity; under the test condition, the average removal rate of TP from domestic wastewater by constructed wetland with zeolite as substrate material was 34.12%. As the TP removal efficiency is not so good, zeolite is not suitable to be used as substrate of constructed wetland individually, and attention must be paid to control the risk of secondary pollution caused by TP desorption.
出处 《工业用水与废水》 CAS 2007年第2期20-22,共3页 Industrial Water & Wastewater
基金 国家高技术研究发展计划(863)项目(2003AA601020)
关键词 沸石 人工湿地 总磷 吸附 zeolite constructed wetland system total phosphorus adsorption
  • 相关文献

参考文献3

二级参考文献84

  • 1郑雅杰.人工湿地系统处理污水新模式的探讨[J].环境科学进展,1995,3(6):1-8. 被引量:51
  • 2蔡惠兰 樊培仁 等.缙云沸石的开发应用[M].地质出版社,1992.121.
  • 3Seidel K. Abbau yon bacterium coli durch hohere wasserpflanzen. Natruwissenschaften, 1964 ,51 : 395.
  • 4Seidel K. Reinigung yon gewassern dureh hohere pflanzen. Natruwissenschaften, 1966, 53:289 - 297.
  • 5Smith I D . A thermal analysis of a sub-surface vertical flow constructed wetland. Wat Sci Tech , 1997, 35(5) :55 -62.
  • 6Greenway M , et al. Nutrient content of wetland plants in constructed wetlands receiving municipal effluent in tropical Australia. Wat Sci Tech , 1997, 35(5) :135 -142.
  • 7Michael L , et al. Transformations in dissolved organic carbon through constructed wetlands. Water Res , 2000, 34(6) :1897 - 1911.
  • 8Gulley J R , et al. In environmental issues and waste management in energy and minerals production. Balkema Rotterdam, 1992. 1431 - 1438.
  • 9Todd L , et al. Nitrate removal in wetland microcosms. Water Res ,1998,32 ( 3 ) :677 - 684.
  • 10Kadlec R H , et al. Chemical, physical and biological cycles in treatment wetlands. Wat Sci Tech , 1999, 40(3) :37 -44.

共引文献300

同被引文献21

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部