摘要
以黑河塘水电站首部枢纽技施设计过程为依据,介绍了总承包模式下的设计特点,通过深化、优化设计,对工程量有一定的控制且更具备可施工性。设计参与施工全过程,可以控制设计变更,对工程投资、施工进度、质量等均有利。
According to design of headworks at Heihetang Hydropower Station, the paper presents design features under EPC mode. The project volume can be controlled to some extent by deepening and optimizing design. Design changes shall be controlled by incorporating designs during entire construction period , which is favorable to project investment, construction progress and quality.
出处
《四川水力发电》
2007年第2期28-30,102,共4页
Sichuan Hydropower