期刊文献+

总承包中的深化设计管理研究 被引量:14

Research on Shop Drawing Management in Lump-sum Construction Contracting
原文传递
导出
摘要 国内推行的建设项目总承包尚未与国际完全接轨,许多大型项目的设计都是由国外进行初步设计,由国内总承商深化设计后才能进行施工,这种设计模式存在一定的问题。本文从承包商角度论述了深化设计的管理内容、方法以及深化设计的项目管理体系,并针对工程总承包中存在的深化设计问题,提出了应对措施和建议。 Lump-sum construction contracting in China has no complete access of the international construction project. Because preliminary design or concept design of some large-scale construction project is done commonly by foreign designers, and the shop drawing, directing construction building, is actualized by domestic designers, there exist some issues in this design model. From the.view of contractor, the paper discussed the contents, methods and system of the shop drawing project management. For solving the troubles exited, some advices and measures were given in the end.
出处 《建筑经济》 北大核心 2007年第5期49-51,共3页 Construction Economy
关键词 工程总承包 深化设计 项目管理 lump-sum construction contracting shop drawing project management
  • 相关文献

参考文献4

二级参考文献4

  • 1刘伊生.项目建设管理[M].北京:北方交通大学出版社,2001..
  • 2国际咨询工程师联合会 中国工程咨询协会编译.设计采购施工(EPC)/交钥匙工程合同条件[M].北京:机械工业出版社,2002..
  • 3国际咨询工程师联合会 中国工程咨询协会编译.施工合同条件[M].北京:机械工业出版社,2002..
  • 4.施工图预算与工程造价控制[M].北京:中国建筑出版社,..

共引文献25

同被引文献36

引证文献14

二级引证文献48

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部