摘要 运用模糊综合评价方法对电力企业变电建设项目进行科学评价,构建基于模糊理论的多级综合测评模型,为电力企业变电建设项目提供快捷可行的评价方法和指导依据。 It is necessary to evaluate scientifically substation construction project of the electric power supply company with comprehensive fuzzy appraisal. In order to provide a quick and feasible appraisal method and guiding basis for substation construction project of electric power enterprise the multi - level comprehensive evaluation model based on the fuzzy theory was built. The Ezhuo 220 kV Hua Rong substation extension project, as an example, was evaluated with comprehensive fuzzy appraisal.
出处 《湖北电力》 2007年第2期68-70,共3页 Hubei Electric Power
关键词 变电建设项目 指标体系 模糊综合评价 substation construction project index system comprehensive fuzzy appraisal
  • 相关文献

参考文献4

二级参考文献2

  • 1国家统计局固定资产投资统计司.中国建筑业统计年鉴[M].北京:中国统计出版社,1996~2000..
  • 2加利 H 杰弗逊 英德杰特 辛格.中国企业改革[M].北京:中国财政经济出版社,2000..

共引文献8

同被引文献13

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部