1000MW强迫风冷封闭母线技术设计研究 被引量:2

Technology Research on 1000 MW Forced Air-Cooling Enclosed Bus
下载PDF
导出
摘要 依据广东岭澳核电站二期2台1000MW发电机组采用强迫风冷母线国际招标书中的技术条件,进行研究,提出了强迫风冷离相封闭母线的发、散热计算程序;冷却用风速、风量、风压的计算条件及风机、冷却器的选择等问题,促进实现强迫风冷封闭母线国产化。 The paper introduced the technology research project in international public bidding of 2 × 1 000 MW forced air-cooling enclosed bus for Phase 2 of Guangdong Lingao Nuclear Power Station. The stress mainly in solution is the study on calculation program of hot balancing trader forced air-cooling condition, calculation of cooling air volume, speed, pressure, and selection of fan and cooler for isolated phase enclosed bus, which will be the basis for realizing the localization of forced air-cooling enclosed bus.
作者 刘庆民
出处 《电力设备》 2007年第5期30-34,共5页 Electrical Equipment
关键词 封闭母线 强迫风冷 热平衡 计算程序 isolated phase enclosed bus forced air - cooling hot balancing calculation program
  • 相关文献

参考文献1

共引文献4

同被引文献12

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部