摘要
依据广东岭澳核电站二期2台1000MW发电机组采用强迫风冷母线国际招标书中的技术条件,进行研究,提出了强迫风冷离相封闭母线的发、散热计算程序;冷却用风速、风量、风压的计算条件及风机、冷却器的选择等问题,促进实现强迫风冷封闭母线国产化。
The paper introduced the technology research project in international public bidding of 2 × 1 000 MW forced air-cooling enclosed bus for Phase 2 of Guangdong Lingao Nuclear Power Station. The stress mainly in solution is the study on calculation program of hot balancing trader forced air-cooling condition, calculation of cooling air volume, speed, pressure, and selection of fan and cooler for isolated phase enclosed bus, which will be the basis for realizing the localization of forced air-cooling enclosed bus.
出处
《电力设备》
2007年第5期30-34,共5页
Electrical Equipment
关键词
封闭母线
强迫风冷
热平衡
计算程序
isolated phase enclosed bus
forced air - cooling
hot balancing
calculation program