环保基础设施BOT项目特许权期的期权博弈分析 被引量:5

Option Game Analysis of Concession Term for BOT Projects in Environmental Protection Infrastructure
下载PDF
导出
摘要 针对环保基础设施BOT项目的期权特性,以特许权期作为政府决策变量,采用期权博弈方法分析项目公司在政府确定特许权期条件下对BOT项目的投资行为,建立了特许权期决策模型以及环保设施建设成本投入决策模型。结果表明,增长期权的引入使得特许权期的确定更合理,项目公司为保证自身利益而提高建设成本投入,从而延长政府对环保基础设施的运营期。 Aiming at the option characteristic of environmental protection infrastructure BOT project, this paper sets the concession term as a government's decision-making variable and uses option game method to analyze the investment behavior of the project company under the condition that the government makes the concession term certain, and establishes the decision making models of the concession term and the investment of cost of environmental protection infrastructure. The result indicates that growth option makes the concession term more reasonable, and the project company enhances investment of construction cost for benefiting themselves. Consequently, the time of government operating the environmental protection infrastructure will be lengthened.
出处 《中国人口·资源与环境》 CSSCI 2007年第2期32-35,共4页 China Population,Resources and Environment
基金 国家自然科学基金资助项目(70371021) 陕西省软科学研究计划项目(2003KR20)
关键词 BOT 特许权期 期权博弈 环保基础设施 BOT concession term option game environmental protection infrastructure
  • 相关文献

参考文献7

二级参考文献19

  • 1金永祥,童玫.BOT项目讲座(十) 价格项目重要的商务条件[J].中国投资(中英文),2002(11):90-91. 被引量:6
  • 2M.M. Kumarsawamy, X.Q. Zhang. Governmental role in BOT-led infrastructure development [ J ]. International Journal of Project Management, 2001,19,195 - 205.
  • 3Jun Shengli,硕士学位论文,1998年,3-6,11-16,30-37,40-5页
  • 4Shen Liyin,J Construction Engineering Management ASCE,1996年,122卷,4期,319页
  • 5Li Qiming,J Construction,MOC,1994年,7页
  • 6Nisangul C.Private participation in infrastruc-ture:a risk analysis of long term contracts in power sector[D].George Mason University,2002.1-5.
  • 7Wang S Q,Tiong R L K.Case study of government initiatives for PRC's BOT power plant project[J].International Journal of Project Man-agement,2000,18(1):69-78.
  • 8Min C L.Contract design of private infrastruct-ure concessions[D].University of California,Berkeley,2000.114-126.
  • 9Tam C M.Build-Operate-Transfer model for infrastructure developments in Asia:reasons for successes and failures[J].International Journal of Project Management,1999,17(6):377-382.
  • 10Felipe V,Stephen A.Private sector participate on in the delivery of highway infrastructure in Central America and Mexico[J].Construction Management and Economics,2004,22:745-754.

共引文献150

同被引文献35

引证文献5

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部