期刊文献+

沿海火电厂厂区防洪(潮)排涝安全设计

Safety Design for Flood(Tide) Protection and Flooded Area Draining in Coastal Thermal Power Plants
下载PDF
导出
摘要 厂址设于沿海的火力发电厂,存在厂区的防洪(潮)排涝安全问题,而厂区的防洪(潮)排涝设计涉及不同行业,行业标准的不一致导致设计时防洪、防潮、排涝不能很好地协调,为此,提出了对厂区防洪(潮)排涝安全进行设防的设计方法,该方法综合了不同行业规范的要求,具有有效、实用、可操作性强的特点。 There exists the safety problem of flood (tide) protection and flooded area draining in coastal thermal power plants. The design for flood (tide) protection and flooded area draining in plant area involves different trades, and the variances among the trade standards lead to poor coordination during design. This paper presents a design method for flood (tide) protection and flooded area draining in plant area, which comprehensively considers the requirements of different trade standards and is featured by efficiency, practicality and strong operability.
作者 程永东
出处 《广东电力》 2007年第5期48-50,共3页 Guangdong Electric Power
关键词 防洪 防潮 排涝 沿海火电厂 厂区 flood control tide protection flooded area draining coastal thermal power plant plant area
  • 相关文献

参考文献4

  • 1JTJ 213-1998. 海港水文规范[S].
  • 2JTJ300-2000.港口及航道护岸工程设计与施工规范[S].[S].,..
  • 3DB44/T182-2004.广东省海堤工程设计导则(试行)[S].[S].广东省质量技术监督局发布,..
  • 4程永东,江洧.允许部分越浪海堤的断面设计[J].水利技术监督,2005,13(3):34-36. 被引量:5

二级参考文献1

共引文献131

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部