期刊文献+

武汉天兴洲公铁两用长江大桥3号主塔墩吊箱围堰设计 被引量:5

Design of Boxed Cofferdam for Pylon Pier No.3 of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge
下载PDF
导出
摘要 武汉天兴洲公铁两用长江大桥3号主塔墩双壁钢吊箱围堰集钢护筒插打定位、导向,钻孔作业平台,承台施工功能于一体,可根据施工水位依靠围堰自身浮力上下浮动。对该围堰的设计特点与设计方法进行介绍。 The double-wall steel boxed cofferdam for pylon pier No. 3 of Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge is designed to have all functions in one, including those of the positioning and guiding construction of setting and driving bored pile steel casings, a working platform for boring construction and the construction of pile cap. The cofferdam can be adjusted upward and downward by its own buoyant force in accordance with the required construction water levels. In this paper, the design features and design method of the cofferdam are described.
作者 龚国锋
出处 《桥梁建设》 EI CSCD 北大核心 2007年第A01期22-25,共4页 Bridge Construction
关键词 吊箱围堰 主塔墩 桥梁基础 设计 boxed cofferdam pylon pier bridge foundation design
  • 相关文献

同被引文献31

引证文献5

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部