国家体育馆钢结构屋架液压同步累积滑移过程中,通过合理设置滑道、滑移推进器,采用计算机同步控制等措施,使钢屋盖高效、平稳、准确就位。
During the process of hydraulic synchronization and accumulative sliding in steel roof of National Stadium, some measures ineluding eomputer synehronous eontrol are adopted to make steel roof perch with high efficieney, smoothly and exactly through rationally setting up slide way and sliding propeller.
出处
《施工技术》
CAS
北大核心
2007年第6期22-24,共3页
Construction Technology
关键词
体育馆
大型钢结构
钢屋盖
累积滑移
计算机同步控制
stadium
large steel structure
steel roof
accumulative sliding
computer synchronous control