小浪底水利枢纽左岸山体防渗处理措施及评价 被引量:2

Seepage control measures for left abutment in Xiaolangdi Hydro Project and their evalution
下载PDF
导出
摘要 针对小浪底水库自1999年10月25日下闸蓄水以来,随着库水位的逐渐升高,两岸坝肩渗漏量有所加大,左岸山体渗漏问题突出的现状,为确保左岸山体稳定,经对左岸山体各部位的渗漏观测情况及库区水文地质条件进行分析,结合瞬变电磁法和同位素示踪法对渗漏通道的探测结果,提出了左岸山体防渗的综合处理措施:帷幕补强,封闭迎库入渗面,加强幕后排水。这些措施实施后,取得了260 m库水位下渗漏减幅达44%的较好效果。 Since the gate of Xiaolangdi Reservoir was closed for water impoundment, the leakage of two abutments has increased with the gradual rise of the reservoir water level, and the leakage of the left abutment was more serious. To ensure the stability of the left abutment, some comprehensive measures for seepage control were proposed based on an analysis of the investigated result of leakage at different parts of the left abutment and hydrological and geological condition of the reservoir region as well as the detected results of seepage passages by transient electromagnetic method and isotopic tracking method. Satisfactory result with the reduction of leakage of 44% was obtained at the reservoir water level of 260 m.
作者 张宏先
出处 《水利水电科技进展》 CSCD 北大核心 2007年第3期49-52,共4页 Advances in Science and Technology of Water Resources
关键词 小浪底水库 库岸山体防渗 渗漏通道探测 补强灌浆 Xiaolangdi Reservoir seepage control of left abutment of the reservoir detection of seepage passage grouting construction for dam strengthening
  • 相关文献

参考文献3

  • 1CASAGRANDE A.Control of seepage through foundation and abutment of dam[J].Geotechnique,1961,11(3):20-21.
  • 2林秀山,高广淳,李明俊,等.黄河小浪底水利枢纽左岸山体渗漏通道分析[R].郑州:黄河勘测规划设计有限公司,2003.
  • 3董海洲,陈建生.小浪底水库左坝肩渗漏天然示踪方法研究[J].人民黄河,2004,26(4):43-45. 被引量:4

二级参考文献2

共引文献3

同被引文献14

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部