期刊文献+

预制箱梁施工工艺探讨 被引量:5

Discussion of Constructional Technology in Pre-made Bridge
下载PDF
导出
摘要 结合京津城际轨道交通线预制箱梁施工,探讨了客运专线条件下箱梁的施工过程中的模板工程、钢筋工程、混凝土工程等的施工方案和施工工艺,并对箱梁的检查验收和施工注意事项做了论述。 On the basis of the construction ofprecast box girder in urban-urban railway from Beijing to Tianjin, were discussed , which the construction technology and construction plan of the formwork engineering, steel engineering and concrete engineering etc. for the precast box girder construction under the passenger traffic railway condition. Were related of the check and acceptance, and caution items during the precast box girder construction process.
作者 孟君祥
出处 《工程建设与设计》 2007年第6期104-108,共5页 Construction & Design for Engineering
关键词 桥梁工程 预制箱梁 施工工艺 质量控制 bridge engineering: precast box girder: constructional technology quality control
  • 相关文献

参考文献2

  • 1中华人民共和国铁道部.铁路混凝土结构耐久性设计暂行规定[Z].北京:中国铁道出版社,2005.
  • 2TB/T 2092-2003预应力混凝土铁路桥简支梁静载弯曲试验方法及评定标准[S].

共引文献7

同被引文献9

引证文献5

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部