结合工程概况,介绍了人工挖孔桩的施工准备工作,从人工挖孔的施工、混凝土的浇筑、成桩质量检验等方面阐述了其施工过程,并对人工挖孔桩施工过程中出现问题的处理措施进行了论述,工程实践效果良好,可为其他类似工程提供参考。
Combined with the general situation of project, it introduces the preparing work of artificial hole-digging pile, elaborates the constructing course from aspects such as artificial hole-digging construction, concrete pouring, pile quality check, etc. It also discusses the processing measures of the existing problems. The project result is good, and can be reference for familiar project.
出处
《山西建筑》
2007年第20期105-106,共2页
Shanxi Architecture
关键词
人工挖孔桩
高层建筑
地下水
流砂层
artificial hole-digging pile, high-floor construction, underwater, sand layer