摘要
通过长山东水道跨海大桥工程主要控制因素分析,初步选择的桥型方案。介绍了方案比较过程,确定出合理的桥型方案。
Through the medium of analysis of major control factors for changshandong water passway, the schemes for bridge types has been selected bridge project spanning the sea over elementally. The paper introduces the process of schemes contrast and the determination of rational schemes.
出处
《北方交通》
2007年第7期58-60,共3页
Northern Communications
关键词
桥型方案
方案比较
控制因素
Schemes for bridge types Contrast of schemes Controlling factors