期刊文献+

关于OPGW光缆终端引下预留缆盘安装规范的探讨 被引量:2

Discussion on installation regulation of reserved leading cable coil in OPGW terminal
下载PDF
导出
摘要 目前,因OPGW光缆终端引下预留缆盘的安装技术规范尚未出台,致使施工人员仅凭光缆厂家提供的安装简图,在未考虑安全要求和周边环境的情况下,盲目施工,造成运行中的OPGW出现断股、断芯等现象,严重影响了通信电路的正常进行。作者根据多年的实践,对OPGW光缆终端引下预留缆盘安装技术规范和工艺要求提出了一整套设想方案,该方案的实施验证了其可行性和有效性。 Since the installation regulation for reserved leading cable coil in OPGW fiber terminal has not been established yet, construction companies make the construction only based on the schematic diagram provided by the manufacturer without considering the safety requirement and peripheral environment. This situation often leads to the problems such as fiber broken, which affects the normal transmission seriously. This paper analyzes the problems occurred, proposes a scheme of technical regulation and requirement for OPGW reserved leading cable coil. The practice shows that the scheme is feasible and effective.
作者 饶思传
出处 《电力系统通信》 2007年第8期67-68,共2页 Telecommunications for Electric Power System
关键词 光纤复合架空地线 预留缆盘 刀闸 OPGW reserved cable coil isolator
  • 相关文献

参考文献5

  • 1DL/T832-2003.光纤复合架空地线[S].[S].,2003..
  • 2GB/T 7424.4-2003.光纤复合架空地线[S].2003.
  • 3DL/T 547-1994.电力系统光纤通信运行管理规程[S].1994.
  • 4DL/T 5080-1997.水利水电工程通信设计技术规程[S].1997.
  • 5GB 50258-1996.电气装置安装工程施工及试验规范[S].1996.

共引文献26

同被引文献13

引证文献2

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部