自锚式悬索桥施工中吊索张拉方法研究 被引量:24

Study of scheme of tensing hangers in construction of self-anchored suspension bridge
下载PDF
导出
摘要 针对自锚式悬索桥施工中体系转换的关键问题——张拉吊索使主梁脱离支架的复杂非线性过程,考虑结构承载能力和张拉设备能力等约束条件,研究了主梁脱离支架状态的确定方法、张拉次数和接长杆数量的优化方法.对万新大桥计算表明,利用该方法,通过4次张拉吊索可以达到理想的主梁脱离支架状态,通过3次张拉吊索可以达到满足要求的实际主梁脱离支架状态,优化后的接长杆数量为全桥吊索数量的27%. Tensing hangers to raise the main girder to leave the brackets is a complicated nonlinear process in construction of self-anchored suspension bridge. Considering bearing capacity of the structure and tensing facilities, the method of determination of state of girder leaving brackets, the optimal scheme of reduction of times of tensing and number of stretching bars are studied. Using this method in construction of Wanxin bridge, the ideal state of main girder leaving brackets can be achieved after four times of tensing and the practical state can be achieved after three times. The optimal number of stretching bars is 27% of all of the hangers.
作者 邱文亮 张哲
出处 《大连理工大学学报》 EI CAS CSCD 北大核心 2007年第4期552-556,共5页 Journal of Dalian University of Technology
关键词 自锚式悬索桥 施工控制 非线性 吊索张拉 self-anchored suspension bridge construction control nonlinearity tension of hangers
  • 相关文献

参考文献2

二级参考文献2

共引文献8

同被引文献112

引证文献24

二级引证文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部