摘要
龙固煤矿根据综采工作面安装的施工方法,通过科学地组织生产,简化施工环节,保证了施工质量,提前完成了任务,并一次试车成功,为今后综采工作面的安装积累了经验。
Acorrding to the installing construction method of the fully mechanized face in Longgu Coal Mine, through organizing production scientifically, simplifying the links in the construction chain, the construction quality is ensured, the job is finished ahead of time. It is successful to test run once. The experience is accumnlated for the installing of fully mechanized faces in future.
出处
《煤炭技术》
CAS
2007年第9期55-56,共2页
Coal Technology
关键词
综采工作面
安装
施工方法
fully mechanized face
installing
construction method