摘要
介绍了大庆石化尿素装置扩能改造工程造粒系统增设的产品冷却系统的工艺流程和重点设备,对系统的开、停工步骤及操作重点做了必要的说明。
Cooling unit is superinduced for the pelleting system of revamp project of Daqing Petrochemical Company Urea Plant. The project process and critical equipments involved in this system are introduced. At the same time,procedures for both start-up/shut-down and operation for the plant are described mainly.
出处
《石油化工设备》
CAS
2007年第B08期21-23,共3页
Petro-Chemical Equipment
关键词
尿素
产品
冷却系统
Urea
production
pelleting cooler