摘要
官亭变电站750kV2#电抗器是国内目前运行电压等级最高的一组高压并联电抗器。分析了750kV高压电抗器在官亭变电站的运行情况和技术监督数据:技术监督数据稳定,油色谱分析数据良好,继电保护和安全自动装置无动作,电抗器整体运行状况良好。提出了未来改造计划:重新建造3台电,抗器的基础,将目前的条形基础改为方形基础,增强电抗器的底部支持面,放弃现在使用的千斤顶;制造一台新的电抗器,替换运行中的电抗器B相。
The 750 kV shunt reactor group running in Guanting substation has the highest voltage in China. This paper analyses the reactor group's operating situation and supervising data: the two-year data is stable; gas chromatographic analysis shows no abnormality; relay protection device do not start. All of these show that the reactor group is in good situation. The technique that modifies the reactor has been discussed: to rebuild the base of the reactors and change the base's shape from rectangle to square; and to manufacture a new reactor to replace the B phase of the reactor group.
作者
崔浩
俞发晖
李青文
马林阳
CUI Hao, YU Fa-hui, LI Qing-wen, MA Lin-yang (750 kV Xining Power Transmission and Transformation Operation Company, Xining Qinghai 810008,China)