摘要
该文作者对人工填土的成因、工程特性及其场地的工程地质勘察方法做了系统总结,文中列举了评价人工填土工程特性的原位测试方法如重型(2)动力触探和标准贯入试验等,提出人工填土地基的加固处理方法。
The article summarized the cause of filling by manual, engineering feature and prospecting methods of engineering geology in field, and listed the testing method of appraising the filling feature, put forward the method to reinforce subgrade filled by manual.
出处
《森林工程》
1997年第2期58-59,32,共3页
Forest Engineering
关键词
人工填土
勘察
设计
评价
Filling by manual prospect appraise