摘要
为确保大冬会的用水要求,黑龙江省亚布力滑雪旅游区水源增容扩建工程于2007年6月25日蓄水。鉴于好汉泊水库目前土坝仅填筑到约379.5 m高程,蓄水后即进入汛期,在此期间工程施工的同时既要保证蓄水又要安全度汛,对工程的度汛情况进行了综合分析。
The capacity increase and extension project is to store water in the Heilongjiang Provincial Yabuli Skiping Touris District on June 25th, 2007 in order to ensure the water demand of National University Winter Games. At present, the earth dike of Haohanpo Reservoir is filled about 379.5m of the elevation, then entering into the flood water period after the storage. Not only the storage but also the safe flood control must be guaranteed during the construction. The paper presents a synthetical analysis for the of flood control project.
出处
《黑龙江水专学报》
2007年第3期44-46,共3页
Journal of Heilongjiang Hydraulic Engineering College
关键词
水源
增容扩建
蓄水
安全度汛
water source
capacity increase and extension
water storage
safe flood control.