关键链项目管理(CCPM)方法应用边界条件研究 被引量:10

Study on application boundary conditions of Critical Chain Project Management(CCPM)
下载PDF
导出
摘要 关键链项目管理(CCPM)方法是约束理论(TOC)在项目管理领域的具体应用,文中在对CCPM方法的基本原理概述的基础上,深入分析了CCPM方法存在的问题,探讨了CCPM方法应用的边界条件,并对有关问题指出了进一步研究的方向,以期促进CCPM方法在提高项目管理绩效方面的应用与研究。 Critical Chain Project Management ( CCPM ) method is the application of the Theory of Constraints (TOC) in project management area. Based on the simple overview of the method, the problems inherent in the assumption behind CCPM, the determination of the critical chain, the time buffer and its application in multi-project environment of CCPM have been thoroughly discussed. Some suggestions for the application boundary conditions of the method have been referred to and relative study directions have been pointed out in order to promote its application in improving project management performances.
出处 《水利水电技术》 CSCD 北大核心 2007年第9期71-74,共4页 Water Resources and Hydropower Engineering
基金 基于公共项目利益相关者理论(PPST)的天津站交通枢纽工程项目整体策划研究(06ZIZLZT02100)
关键词 关键链项目管理 边界条件 缓冲区 约束理论 Critical Chain Project Management boundary condition time buffer theory of constraints
  • 相关文献

参考文献12

  • 1Tavi Raz,Robert Barnes,Dov Dvir.A Critical Look at Critical Chain Project Management[J].Project Management Journal,2003,(12):24-31.
  • 2艾利,高德拉特(Eliyahu Goldratt).关键链[M].罗嘉颖译.北京:电子工业出版社,2006.75-76.
  • 3Larry P Leach.Critical Chain Project Management Improves Project Performance[J].Project Management Journal,1999,(6):39-51.
  • 4Hill Thomas Allen.Experts' estimate of task durations in software development projects[J].International Journal of Project Management,2000,12 (1):13-24.
  • 5Genaro J Gutierrez,Panagiotis Kouvelis.Parkinson's Law and Its Implications For Project Management[J].Management Science,1991,37(8):990-1001.
  • 6赵道致,廖华,刘一骝.关键链法:一种新型的项目进度计划方法[J].天津理工大学学报,2005,21(2):8-12. 被引量:32
  • 7Willy Herroelen,et al.Critical Chain Project Scheduling:Do Not Oversimplify[J].Project Management Journal,2002,(12):48-60.
  • 8单汨源,龙颖.一种关键链缓冲机制改进方法及其应用研究[J].项目管理技术,2006,4(9):32-35. 被引量:21
  • 9蔡晨,万伟.基于PERT/CPM的关键链管理[J].中国管理科学,2003,11(6):35-39. 被引量:105
  • 10Zinovy D Radovilsky.A Quantitative Approach to Estimate the Size of Time Buffer in the Theory of Constraints[J].International Journal of Production Economics,1998,55(2):113-1.

二级参考文献29

  • 1万伟,蔡晨.TOC及其在项目管理中的运用[J].中国管理科学,2002,10(z1):155-160. 被引量:6
  • 2曹光明,白思俊.国外PERT/CPM网络计划技术发展的三个方面[J].系统工程理论与实践,1993,13(3):1-10. 被引量:35
  • 3Goldratt E M, Cox J. The Goal E M1. 2nd ED.Aldershot :Gower, 1993.
  • 4Goldratt E M. It's Not Luck[M]. Aldershot: Cower,1994.
  • 5Goldratt E M. Critical Chain [M]. MA.. The North River Press, 1997.
  • 6Rand G K. Critical chain: The theory of constraints applied to project management [J]. Int J of Project Management, 2000, 18(3): 173-177.
  • 7Steyn H. An investigation into the fundamentals of critical chain project scheduling [J]. Int J of Project Management, 2000, 19(6). 363-369.
  • 8Herroelen W, Leus R. On the merits and pitfalls of critical chain scheduling[J]. J of Operations Management, 2001, 19(5): 559-775.
  • 9Wei C C, Liu P H, Tsai Y C. Resource-constrained project management using enhanced theory of constraint[J]. Int J of Project Management, 2002,20(7) : 561-567.
  • 10Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct(EPC) projects [J]. Int J of Project Management,2002, 20(4): 253-262.

共引文献231

同被引文献133

引证文献10

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部