结合水布垭工程实际,对土石方施工过程中机械设备合理配置和科学调度的重要性、指导思想以及方法等问题进行了分析研究,旨在通过对这些问题的分析,总结出一套能适用于一般土石方工程施工的、科学高效的机械设备配置及调度方法。
By combining with the concrete conditions of Shuibuya project, this paper analyzes and studies the importance, guiding idea and methods of the rational allocation and scientific dispatching of mechanical equipment in the earth-rock works construction, aiming to sum up a set of scientific and effective methods for rational allocation and scientific dispatching of mechanical equipment.