期刊文献+

基于ANSYS的LRB性能模拟验证分析 被引量:5

Validation Analysis of LRB Capability Simulation Based on ANSYS
下载PDF
导出
摘要 铅芯橡胶支座(LRB)是一种有效的隔震装置,它通过延长结构的周期、增加结构的阻尼来减小结构的地震反应。在结构隔震分析中,LRB扮演了一个很重要的角色,对其模拟程度的正确与否对整个结构的分析结果将产生很大影响。本文采用大型通用有限元程序ANSYS,对一个单自由度隔震体系进行了LRB性能模拟验证分析,分析表明:在合理确定输入地震动PGA临界点的前提下,采用ANSYS中的Combin40单元来模拟LRB的滞回性能,能获得较为满意的效果;同时通过与SAP2K时程分析比较,也验证了ANSYS分析结构隔震的可靠性。 Lead rubber bearing (LRB) is an effective isolation device which can reduce the structural seismic response by lengthening the structure period and increasing the structure damping. LRB plays an important role during the structural isolation analysis, and will directly have a great effect on analysis results of the whole structure whether the isolation bearing is correctly simulated or not. In this paper, a great current FEA program ANSYS is adopted and the validation analyses of the LRB capability simulation are conducted for a single degree of freedom seismic isolation system. Finally, it is indicated that the satisfactory effects can be obtained by employing the element Combin40 in ANSYS to simulate the LRB hysterestic capability after PGA critical value of the earthquake ground motion input is properly confirmed. Simultaneously, the reliability of analyzing the structural isolation by ANSYS is also validated through comparing with results of the time-history analysis by SAP2K.
作者 龙晓鸿 李黎
出处 《工程抗震与加固改造》 2007年第4期53-56,62,共5页 Earthquake Resistant Engineering and Retrofitting
基金 交通部西部科研项目(200431800024)
关键词 LRB 性能模拟 时程分析 ANSYS LRB capability simulation time-history analysis ANSYS
  • 相关文献

参考文献6

  • 1Park K S,Jung H J,Lee I W.A comparative study on aseismic performances of base:isolation system for multispan continuous bridge[ J ].Engineering Structures,2002,24,1001-1013
  • 2唐家祥,刘再华.建筑结构基础隔震[M].武汉:华中理工大学出版社,1992
  • 3Park J G,Otsuka H.Optimal yield of bilinear seismic isolation devices[ J ].Earthquake Eng.Struct.Dyn.,1999,28(9),941-955
  • 4Hwang J S,Sheng L H,Gates J H.Practical analysis of baseisolated bridges with bi-linear hysteresis characteristics[J].Engineering Spectra,1994,10(4),705-727
  • 5Mutobe R M,Cooper T R.Nonlinear analysis of a large bridge with isolation bearings[J].Computers and Structures,1999,72,279-292
  • 6Eurocode8-Design provisions for earthquake resistance of structures[S].Part 2-bridges.1994

同被引文献33

  • 1黄海生,王柏生.基础隔震建筑非线性动力响应的时程计算方法[J].振动与冲击,2005,24(3):50-52. 被引量:12
  • 2谭平,周云,周福霖.大底盘多塔楼结构的混合隔震控制[J].世界地震工程,2007,23(2):12-19. 被引量:33
  • 3王建平 邹银生.结构非线性恢复力分析中的恢复力拐点的非迭代处理方法[A]..全国第三届地震工程会议论文集(Ⅲ)[C].大连:中国地震学会地震工程专业委员会,1990.1072-1078.
  • 4Tan R Y, Huang M C. System identification of a bridge with lead-rubber bearings [ J ]. Computers &Structures, 2000, 74 (3) : 267-280.
  • 5Jangid R S, Optimum lead-rubber isolation bearings for nearfault motions [ J ]. Engineering Structures, 2007, 29 ( 10 ) : 2503 -2513.
  • 6韩爱红,张新中,邓子辰,张亚锋,宋早雪.基础隔震结构地震响应时程分析新方法[J].振动与冲击,2007,26(7):145-148. 被引量:2
  • 7Farazad Naeim,James M Kelly.Design of Seismic IsolationSrtuctures:From Theory to Practice[M].Newyork:John Wi-ley&Sons,1999.
  • 8Skinner R I,Robinson W H,Meverry G H.An Introductionto seismie Isolation[M].谢礼立,周雍年,赵兴权,译.北京:地震出版社,1996.
  • 9Wen Y K.Method for random vibration of hysteretic systemsanalysis[J].Engng Mech ASCE,1976,102:249-263.
  • 10Tan R Y,Huang M C.System identification of a bridge withlead-rubber bearings[J].Computers&structures,2000.74(3):267-280.

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部