万家寨水利枢纽排沙系统试运行振动测试分析 被引量:2

Vibration test on trial operation of sand flushing system for Wanjiazhai multipurpose dam project
下载PDF
导出
摘要 黄河万家寨水利枢纽通过对排沙系统试运行振动测试试验,了解排沙系统运行时对电站厂房水工建筑物及相关设备的振动特征及振动指标,分析排沙系统在各工况下运行时对厂房结构的振动影响,证实了水电站厂房结构及相关设备满足振动规范要求。对排沙系统运用提出改进措施及建议。 The vibration tests on trial operation of sand flushing system were performed for Wanjiazhai multipurpose dam project in order to acquaint with vibration characteristics and vibration index of powerhouse structure and related equipment in plant, analyze vibration effect on powerhouse structure in case the sand flushing system is under various operations, and confirm that the powerhouse structure and related equipment have met vibration requirements of the Specifications. Measures and suggestions are lodged for the sand flushing system.
出处 《西北水电》 2007年第3期79-81,共3页 Northwest Hydropower
关键词 万家寨水利枢纽 排沙系统 试运行 振动测试 Wanjiazhai multipurpose dam project sand flushing system trial operation vibration test
  • 相关文献

同被引文献17

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部