期刊文献+

基于任务预处理的信息系统查询方法研究与应用

Research and Application of Task Pre-Processed Query Method of Information System
下载PDF
导出
摘要 针对企业信息系统中查询处理时间较长、响应较慢等问题,提出了一种基于Agent和XML技术的查询优化算法。首先每个用户根据自己的工作任务和计划定制查询任务,然后将所有用户的任务放入一个任务池,接着通过任务调度算法逐个执行每个定制任务,最后存储执行结果。当用户需要这些数据时,直接取出缓存的结果返回给用户。实验证明,该方法大大节约了用户提交查询后的等待时间,提高了用户的工作效率。 With an aim at the problems of longer time query processing and slow response in the enterprise information system, this paper suggests a kind of querying optimization algorithm based on Agent and XML. To begin with, every user customizes the query tasks according to his or her jobs and plans; In the second place, the tasks of all the users are put into a task pool, and then, every customized task should be executed one by one via the task scheduling algorithm, and finally, the executed results are stored. The results stored are taken out and returned to the users when needed. The experiments proved that this method might greatly reduce the response time after submission and furthermore improve the user's working efficiency.
出处 《西安理工大学学报》 CAS 2007年第3期310-313,共4页 Journal of Xi'an University of Technology
基金 陕西省自然科学基金资助项目(2005F05) 西安市信息技术专项资助项目(ZX06030)
关键词 AGENT XML 信息系统 查询优化 任务调度 Agent XML information system query optimization task scheduling
  • 相关文献

参考文献7

二级参考文献27

  • 1刘云生.特种数据库技术[M].北京:北京科学出版社,2000..
  • 2ZHOU Liangyu. Design of distributed information systems for agile manufaeturing virtual enterprises using CORBA and STEP standards [ J ]. Journal of Manufaeturing Systems,2002, 21(1) : 14- 18.
  • 3MARTIN W, MOIRA C N, WERNER S. Multidatabase agents for CIM systems[J]. International Journal of Computer Integrated Manufacturing, 1996,9 (4) : 293- 298.
  • 4ROY U, XU Y. Computation of a geometric model of a machined part from its NC machined programs[J]. Computer-Aided Design, 1999,31(1) :401-411.
  • 5LUO Yabo, ONG S K, CHEN Dingfang,et al. An Internet - enabled image- and model-based virtual machining system[J]. International Journal of Production Research, 2002, 40(10) :2269-2288.
  • 6BERNARD B. Agents in the world of active Web-services [EB/OL]. http://www. hpl. hp. com/org/stl/maas/docs/HPL-2001-295. pdf,2001- 11.
  • 7ZHAO Bo, FAN Yushun. Multi-agent based integration of scheduling algorithm[A]. Proceedings of the IASTED International Conference- Intelligent Systems and Control [C].2001.55-59.
  • 8SOUSA P, RAMOS C. A distributed architecture and negotiation protocol for scheduling in manufacturing systems[J] .Computers in Industry, 1999,38 (2): 103-113.
  • 9SUN J,XUE D. A dynamic reactive scheduling mechanismfor responding to changes of production orders and manufacturing resources[J]. Computers in Industry,2001,46(2): 189-207.
  • 10WOOLDRIDGE M 石纯一 张伟.多Agent系统引论[M].北京:电子工业出版社,2003..

共引文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部