摘要
为减少巷道淤泥及清理水仓而设置的流水沉淀池,一般多为地坑式或巷旁壁龛式。此种方式,不仅清池困难,沉淀容量小,且占用设备。本文从采矿工程角度,对流水沉淀池的布置进行探讨,提出了在采区下部设置沉淀池的方法。
Most of stilling pool for storage mud at the roadway are stilling pit or alcove types.The mud storage capacity of such kinds of stilling pool are lower.To clean the mud is not only difficult but more equipmets must be used.Base on the mining engineering offered and probed into the layout of runing water stilling pool and the method under mining district.
关键词
采区
平巷
沉淀池
流水
采区涌水
roadway under mining district,stilling pool,design,Xinan Coal Mine