客运专线64m PRC简支梁节段预制3200t造桥机整孔架设施工技术 被引量:5

Construction Techniques for Segment Precasting and Full Span Erection of 64-m Span Simply-Supported PRC Box Girders for Passenger Dedicated Rail-way by 3200-t Overhead Launching Gantry
下载PDF
导出
摘要 温福铁路白马河大桥64 m简支混凝土箱梁,采用节段预制,3 200 t造桥机整孔架设的施工方案。介绍节段梁块的预制、存放和运输;大型造桥机及其架梁施工和拖拉走行;预应力束张拉时考虑主桁梁对梁体作用力的影响和控制等成功经验。 The construction scheme of segment precasting and full span girder erection by 3 200-t overhead launching gantry was adopted for the 64-m span simply-supported concrete box girders of Baima River Bridge on Wenzhou-Fuzhou Railway. This paper presents the successful experiences in aspect of precasting, storage and transportation of the segments of the concrete box girders, application of the large capacity overhead launching gantry, erection of the girders by the gantry, hauling and traveling of the gantry, and consideration and control of influence of action forces from the main truss girder of the gantry on the concrete box girders at the time the prestressing strands were jacked.
作者 陶建山
出处 《桥梁建设》 EI CSCD 北大核心 2007年第A02期49-53,共5页 Bridge Construction
关键词 箱形梁 节段预制 造桥机 整孔架设 桥梁施工 box girder segment precasting overhead launching gantry full span erection bridge construction
  • 相关文献

同被引文献15

引证文献5

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部