期刊文献+

火电厂湿式石灰石——石膏烟气脱硫系统建设与运行的若干问题 被引量:6

Several problems of wet limestone-gypsum flue gas desulfurization system construction and operation in power plant
下载PDF
导出
摘要 讨论了火电厂湿式石灰石-石膏烟气脱硫系统建设与运行中的一些问题,包括结垢与堵塞、烟囱腐蚀、安装气体-气体换热器与否、除灰脱硫联合运行、排污交易权、电价核定、脱硫工程评估等,就此提出相应对策,最后探讨了火电厂脱硫的发展趋势。 It discussed some problems of power plant wet limestone - gypsum flue gas desulfurization system construction and operation, including scaling and block, chimneys corrosion, installation of GGH or not , ash desulfurization co-operation, emissions trading rights, tariff approved, desulfurization project assessment, and put forward corresponding, countermeasures, then finally discussed development of power plant desulfurization.
出处 《安徽电力》 2007年第3期42-47,共6页 Anhui Electric Power
关键词 湿式石灰石-石膏烟气脱硫系统 结垢与堵塞 烟囱腐蚀 GGH 除灰脱硫联合运行 排污交易 电价核定 工程评估 wet limestone-gypsum flue gas desulfurization system scaling and block GGH ash desulfurization co-operation emissions trading cost price approved project assessment
  • 相关文献

参考文献12

二级参考文献34

共引文献141

同被引文献14

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部