摘要
通过对国内一系列700 MW级巨型全空冷水轮发电机的设计、制造和安装的实践,以及三峡右岸和龙滩电站全空冷水轮发电机的投产运行,对全空冷技术在巨型水轮发电机上的运用有了新的认识。本文简要介绍巨型全空冷水轮发电机设计、制造、安装和运行的系列情况,提出初步工程实践后的部分技术意见和建议,以期对推动我国水轮发电机空冷技术进一步发展有所帮助。
Some new knowledge is known by designing,manufacturing and installing a series of 700MW fully air-cooled hydro-generators as well as by the running of the units installed in the right bank station of Three Gorges Hydropower Plant and Longtan Hydropower Station.This paper briefly introduces the de- sign,manufacture,installation and running of the huge fully air-cooled hydro-generators.Some technical opinions and proposals are put forward so as to be propitious to the technical advancement of this type of generator in China.
出处
《水电站机电技术》
2007年第5期1-7,共7页
Mechanical & Electrical Technique of Hydropower Station
关键词
巨型水轮发电机
全空冷技术
工程实践
huge hydro-generator
fully air-cooled technique
engineering practice