期刊文献+

线路与编组站能力限制下的车流组织模型与模拟退火方法 被引量:1

A Simulated Annealing Approach to Railroad Operating Problem with Limits on Yard and Line Capacity
下载PDF
导出
摘要 研究了在线路能力、编组站能力(改编能力、通过能力及可利用的调车线数量)与装卸车能力受限条件下的车流组织方案优化问题.其目标是最小化集结费用、改编费用、换算车公里费用,以及组织始发直达而产生的换算车小时消耗,并满足车站和线路的有关能力限制.为此,建立了该问题的两类数学优化模型:大规模的非线性混合整数规划形式和非线性0—1规划形式.基于此类问题的难度,采用了模拟退火算法处理所建模型。 This paper presents the formulation and solution of the China railroad opera ting plans with capacity constraints on yard and line. The objective is to determine optimal train connections,frequencies,and blocking and routing plans for freight cars,and capacity consuming of links and yards in railway network.These decisions are developed two combinatorial optimization model:the mixed integer programming and nonlinear 0 1 programming problem.We know the problems is NP complete, hence it is difficult to solve for a globally optimal solution.In this paper we propose a simulated annealing algorithm for the railroad operating plans.We demonstrate the ability of this algorithm to determine a globally optimal solution for two different networks.
作者 林柏梁
出处 《北方交通大学学报》 CSCD 北大核心 1997年第3期264-272,共9页 Journal of Northern Jiaotong University
基金 国家自然科学基金
关键词 铁路车流组织 模拟退火 线路能力 编组站能力 railroad operating plan\ simulated annealing \ yard capacity line capacity
  • 相关文献

参考文献11

二级参考文献12

  • 1朱松年,科学技术研究成果公报,1993年,4期
  • 2朱松年,运筹与决策.1,1992年
  • 3朱松年,1991年
  • 4团体著者,铁路行车组织,1988年
  • 5林柏梁,铁道学报,1994年,16卷,2期
  • 6林柏梁,博士学位论文,1994年
  • 7朱松年,铁道学报,1993年,15卷,3期
  • 8高旭敏,博士学位论文,1993年
  • 9施其洲,上海铁道学院学报,1989年,3期
  • 10波罗沃依 H E,货物运输直达化,1981年

共引文献41

同被引文献50

引证文献1

二级引证文献20

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部