摘要
本文介绍了三峡三期RCC围堰爆破拆除方案。该方案通过对设计中遇到的围堰倾倒可靠性、深水爆破装药量确定等技术难题进行了分析与研究,提出了相应解决方法和处理措施,确保了三峡三期RCC围堰拆除爆破的成功。
The removal plan of RCC cofferdam of the Three Gorges Reservoir is introduced. Key technologies such as dumping reliability of cofferdam and deciding blast loading in deep water are investigated and related measures are put forward, which ensure the success of removal of RCC cofferdam of the Three Gorges Reservoir.
出处
《中国水利》
2007年第21期53-54,52,共3页
China Water Resources
关键词
三峡
RCC围堰
拆除方案
爆破
Three Gorges
RCC cofferdam
removal plan
blasting